RSS

Author Archives: denbeckdesigns

Project Control List

935370_10201028719382741_1403173428_n

 

 

This is a part of the iterative process. First there is the initial idea! Then there is the initial Planning, which includes any gathering of research materials, etc. Next are the requirements and the analyzing/design aspects of the game–basically implementing the ideas from the planning process and creating the artwork. Implementation and development stage is where we get into the coding and spritesheets, merging the art and technical sides to create a beta version of the game. Then comes the testing, which is important for any game or animation, etc. Then there is the evaluation and then deploying the game to make sure that all bugs are worked out of the game.  Implement/develop, test, evaluate, and deploy occur several times until the game reaches desired state of being AND it works! 😀

 
Leave a comment

Posted by on May 13, 2013 in Uncategorized

 
 
Design a site like this with WordPress.com
Get started